
OPERATIONS ORDER
Operation Mockingbird (2025), Silent Guardian
TO:
OPERATIONS OFFICER
United Task Force
UNITAF Forces Isla Abramia
OPERATIONS OFFICER
United Task Force
UNITAF Forces Isla Abramia
FROM:
Lt Gen Chad P. Franks
CMDR CJTF USCENTCOM
MacDill Air Force Base Tampa, U.S.
Lt Gen Chad P. Franks
CMDR CJTF USCENTCOM
MacDill Air Force Base Tampa, U.S.
--- OPERATIONS ORDER ---
Situation
Background Information1/5, Great Job Marines. We have secured our MUE HQ and dealt a swift blow to the EN in the AO. S-2 has given us a new target to act upon to exploit the EN while they are regrouping. We have been tasked with DESTROY of the EN communications and Armory on the Island to our south. IOT to cripple the EN ability to effect FN troops once they make land fall on the main island and start their humanitarian aid relief.
Mission
Execution
Commander's IntentThe purpose of this mission is to disable a near southern communications relay enabling armory logistics, and to seize the greater island to enable a further foothold towards mainland operations.
Tasks and Sequencing
PHASE 0: Preparation - ALL CALLSIGNS ensure adequate supplies on person to sustain operations without external logistic support. -- Special considerations are detailed in Administration/Logistics OPORD section. -ALL CALLSIGNS mount RHIBs for naval insertion.
PHASE 1: Insertion
-ALL CALLSIGNS rally at RP-A and depart for LZ-Primary utilizing the cover of night, just prior to dawn.
- LZ-Primary will be utilized if concealment is maintained.
-- LZ-Secondary & LZ-Contingency will be utilized if concealment is compromised.
Weapons Orange: delaying contact is critical.
PHASE 2: Disable Communications
- ALL CALLSIGNS move to OP-A and commence area recon to locate communication assets.
- Upon communications asset discovery, BAKER 1-3 emplaces Machinegunner & Marksman in a supporting position.
-- BAKER 1-1 & BAKER 1-2 assault via covering fire and deactivate OPFOR communications equipment as quickly as possible.
Weapons Orange: delaying contact is critical.
PHASE 3: Water Crossing
- BAKER 1-3 establishes fire superiority on objective via BOF-B, softening priority targets as detailed in PHASE 4.
-- BAKER 1-1 & BAKER 1-2 cross and establish security on perimeter wall.
- With security established and priority targets eliminated, BAKER 1-3 crosses water.
PHASE 4: Armory Clearing
- ALL CALLSIGNS breach rear of armory at southern low wall.
-- BAKER 1-1 & BAKER 1-2 clear #1 & #2 marked buildings, proceeding in clockwise clearance.
-- BAKER 1-3 establishes BOF at the southern guard tower, locking down the compound entrance and supporting clearing efforts.
Smoke grenades will be utilized to cover initial movements out of canalizing ground and into sector assignments.
PHASE 5: QRF Defense
- ALL CALLSIGNS reposition to defend island movements towards armory.
-- BAKER 1-1 digs in at entrance, optimizing position of AT assets.
-- BAKER 1-2 if available, adopts a supporting position.
-- BAKER 1-3 moves to northeastern guard tower and emplaces heavy weapon assets.
PHASE 6: Seize Blanco *if required*
- ALL CALLSIGNS proceed to RP-E via RP-D.
-- BAKER 1-3 establishes fire superiority at BOF-C.
-- BAKER 1-1 & BAKER 1-2 utilize defilade to flank obj.
- BAKER 1-1 & BAKER 1-2 clear village from north east to south west, coordinated by BAKER 1.
Upon island capture, ALL CALLSIGNS regroup for ENDEX.
Administration/Logistics
ResupplyResupply will be unavailable for the duration of this operation. All supplies required to sustain operations for the duration of this mission must be carried on person. BAKER 1 will carry additional MAT ammunition as coordinated through BAKER 1-1. BAKER 1-3's ammo bearer will be dedicated solely to M240B ammunition. Team Leaders will be provided backpacks to carry STANAG for their respective teams. Note: Additional carrying capacity will be made available as requested by Team Leaders.
Medical
- Medical support will be conducted in field (PAK in Field)
Rules of Engagement
In accordance with SOP
Fire Support Plan
In accordance with SOP
Close Air Support
In accordance with SOP
Command/Signal
Communications Plan
| Callsign | Primary Frequency | Superior Frequency | ACTUAL |
|---|---|---|---|
| BAKER 1 | 250mHz | 40mHz | SFC mbaker5114 Squad Commander (≤15) |
| BAKER 1-1 | 251mHz | 250mHz | Fireteam Leader (≤6) |
| BAKER 1-2 | 252mHz | 250mHz | Cpl Stormaple Acting Fireteam Leader (≤5) |
| BAKER 1-3 | 253mHz | 250mHz | Cpl Roy Callaghan (Ret.) Fireteam Leader (≤6) |
In accordance with SOP
CONNECTION INSTRUCTIONS
TEAMSPEAK IP: ops.unitedtaskforce.netGAME SERVER IP (Direct Connect): ops.unitedtaskforce.net
GAME SERVER PASSWORD: issued on Discord
TIMINGS
SERVER OPENS: 030hrs UTCFORM UP: 100hrs UTC
ANNOUNCEMENTS/BRIEFING: 115hrs UTC
STEP OFF: 125hrs UTC
END-EX: 300-400hrs UTC APPROX
All are GMT/UTC