
OPERATIONS ORDER
Operation Everyman (2015), Revenge of Chapultepec
TO:
OPERATIONS OFFICER
United Task Force
UNITAF Forces Akarya
OPERATIONS OFFICER
United Task Force
UNITAF Forces Akarya
FROM:
Lt Gen Chad P. Franks
CMDR CJTF USCENTCOM
MacDill Air Force Base Tampa, U.S.
Lt Gen Chad P. Franks
CMDR CJTF USCENTCOM
MacDill Air Force Base Tampa, U.S.
--- OPERATIONS ORDER ---
Situation
Background InformationAt 0430 an enemy FOB was located with large amounts of enemy assets. An LRRP found an enemy HVT to be in the area and a suspected command post. They are using this FOB to create a foothold for air and sea denial in the AO. The MEU has been tasked with sending in a squad-sized element of RECON Marines to asses and engage if necessary.
Friendly Forces
Higher: Charlie Company, Will conduct a company-size recon movement on CoObj A. Adj: 2nd Plt will be conducting recon on the NW side of the island. 3rd Plt will be standing by at the AA for QRF. Att: Attached: Reaper drone in AO.
Supporting Assets
None
Enemy Forces
T: 0400 S: Company sized U: Akaryan Red Star A: setting up a FOB L: on CoObj A E: expected to have, Small Arms, RPGs, Morotrs, Heavy MG, Armor Assets The enemy is expected to defend and reinforce due to their heavy dug-in position and strategic assets.
Mission
TaskingP: To conduct a Company recon on BN AO, and locate HVT. M: Platoon sized Recon
End-state
E: gathered enough intel to being to BN and HVT is either captured or killed.
Execution
Commander's IntentThe purpose of this mission is to gather intelligence on, and disrupt enemy defenses on the northern Akarya isles in preparation for a landing force.
Tasks and Sequencing
PHASE 0: Preparation - ALL CALLSIGNS ensure adequate supplies on person to sustain operations without logistic support for the duration of this mission. -- Any additional support required for adequate load bearing is to be communicated to BAKER 1. - ALL CALLSIGNS will be outfitted with NVGs, suppressors, and equipment for airdrop. - Team Leaders will be provided IR strobes and collapsible ladders for use during facility breach. PHASE 1: HAHO Airdrop - ALL CALLSIGNS mount in Osprey in preparation for HAHO airdrop. -- Team Leaders attach IR strobes for team coordination during airdrop. - BAKER 1 coordinates airdrop procedures: -- Jump altitude: 2100m -- Parachute deployment altitude: 2000m - All Callsigns regroup on RP-A.
UAV Operator confirms HVT location and scans the AO for AA emplacements.
PHASE 2: Objective Isolation
- ALL CALLSIGNS move to RP-B via forest concealment.
- Combat Engineer conducts road mining in accordance with scheme of engineer operations.
-- BAKER 1-1 & BAKER 1-2 ensure security and concealment.
UAV Operator assists with stealth maintenance during objective isolation efforts.
PHASE 3: HVT Elimination
- ALL CALLSIGNS move to RP-C, or a more accurate HVT location as confirmed by UAV Operator.
- Method of HVT elimination to be determined in field alongside full information of enemy forces and emplacements.
- Stealth maintenance through phase 3 must be maintained to affect further sabotage objectives.
PHASE 4: Command Sabotage
- ALL CALLSIGNS access compound via RP-D or comparable position, utilizing Team Leaders carried ladders.
-- Combat Engineer places satchel charges on command buildings, guarded by BAKER 1-1 & BAKER 1-2.
- ALL CALLSIGNS exit compound via the second ladder, or utilizing nearby structures to scale compound wall.
UAV Operator assists with stealth maintenance.
PHASE 5: Civilian Informant
- Utilizing Team Leaders carried ladders, ALL CALLSIGNS re-enter compound via RP-E or comparable position.
- Using internal wood line cover and friendly civilian compounds, ALL CALLSIGNS maneuver west to RV with a known civilian informant and gather information.
- Stealth to be maintained for as long as possible, assisted by UAV Operator. Upon being discovered, weapons green.
PHASE 6: Detonation & Exfil
- Upon completion of all sabotage objectives or being discovered, Combat Engineer detonates charges on command buildings and AA positions.
-- ALL CALLSIGNS maneuver to exfil location via RP-F, dealing as many casualties as possible during the movement.
UAV Operator fires upon any QRF forces overcoming the mined road, and assisting with priority targets in direct engagement with BAKER 1.
Administration/Logistics
ResupplyLOGISTIC SUPPORT WILL BE UNAVAILABLE UNTIL for the duration of this operation. ALL CALLSIGNS will infil with sufficient supplies to sustain the assigned operations. Any requirements for additional carrying capacity or load spreading should be coordinated through BAKER 1. Ammo Bearer will exclusively assist the Combat Engineer with carrying of mining supplies. BAKER 1 will also assist with carrying mining supplies for the Combat Engineer.
Medical
COMPLETE MEDICAL SUPPORT WILL BE CONDUCTED IN FIELD (PAK IN FIELD ON).
Rules of Engagement
In accordance with SOP
Fire Support Plan
The UAV Operator will remain on standby for priority threat elimination as coordinated through BAKER 1.
Close Air Support
In accordance with SOP
Command/Signal
Communications Plan
| Callsign | Primary Frequency | Superior Frequency | ACTUAL |
|---|---|---|---|
| BAKER 1 | 250mHz | 40mHz | MSG mbaker5114 Squad Commander (≤15) |
| BAKER 1-1 | 251mHz | 250mHz | SP3 Bossatron Fireteam Leader (≤6) |
| BAKER 1-2 | 252mHz | 250mHz | SP3 ParklifeSA Fireteam Leader (≤6) |
In accordance with SOP
CONNECTION INSTRUCTIONS
TEAMSPEAK IP: ops.unitedtaskforce.netGAME SERVER IP (Direct Connect): ops.unitedtaskforce.net
GAME SERVER PASSWORD: issued on Discord
TIMINGS
SERVER OPENS: 2230hrs UTCFORM UP: 2300hrs UTC
ANNOUNCEMENTS/BRIEFING: 2315hrs UTC
STEP OFF: 2325hrs UTC
END-EX: 100-200hrs UTC APPROX
All are GMT/UTC