
OPERATIONS ORDER
Operation Diffidentia (2016), Day 5
OPERATIONS OFFICER
United Task Force
UNITAF Forces Virolahti, Finland
Lt Gen Chad P. Franks
CMDR CJTF USCENTCOM
MacDill Air Force Base Tampa, U.S.
--- OPERATIONS ORDER ---
Situation
Background InformationFollowing our continuing advance east, we have established a temporarory Forward Operating Base, FOB Singer, figures 046 059. With the ultranationalists on the back foot and only 4km's of enemy territory remains on the southern peninsula of the mainland. The rest are reinforced to the east across the maring bay.
ENEMY FORCES
STATIONED TO THE SOUTH AND EAST OF FOB SINGER - SIMILAR COMPOSITION OF FORCE AS ENCOUNTERED PREVIOUSLY. INFANTRY AND ARMOUR EXPECTED.
FRIENDLY FORCES
- INFANTRY PLATOON, CALLSIGN OUTLAW (HQ WITH M113)
- MORTAR ATTACHMENT CALLSIGN HAMMER
- SUPPORT ENGINEER ATTACHMENT WITH M113 (240B)
Mission
TaskingPRIMARY TASKING
Our primary tasking this evening is to push the enemy completely of the southern penisula by taking out a known logistics position stationed 4 clicks south of our current. It is suspected to be a main depot for amphibious armour units. Our extended tasking should we be successful is to continue the pressure by pushing east, over maring bay towards a further installation identified by prior intellience, and to establish control on the east side of the bay for further operations.
Execution
Tasks and SequencingStarting from FOB Singer, UNITAF will be inserted by M113 to 3 initial insertion points marked as IP1 2 clicks south our current. Where the platoon will advance south in a platoon line formation assaulting directly into identified enemy territory. Movement should be calculated and controlled, and platoon callsigns should remain aware of the furtherest advanced position to avoid friendly fire and to allow mortar teams to fire to full effect.
- ASSAULT TO AND DESTROY ENEMY ARMOR DEPOT - PRIMARY
- GAIN FOOTHOLD EAST OF MARING BAY - NEUTRALISING ENEMY STRONGHOLD - PRIMARY
- JOIN ASSAULT NORTH EAST TO ENEMY TOWN - SECONDARY
SHOULD ALL PRIMARY OBJECTIVES BE MET, THE OPERATION WILL BE CONSIDERED A SUCCESS.
EQUIPMENT
- 1x M113 (Platoon HQ) c/s OUTLAW
- 1x M113 240B c/s GROUNDHOG
- 1x 60mm Man Portable Mortar System c/s HAMMER
- 1x FOOT-LAUNCHED RECONNAISSANCE DRONE c/s OUTLAW
BATTLE DRILLS AND ACTIONS ON
WILL BE CONDUCTED IN ACCORDANCE WITH UNIT SOP.
MEDIVAC & CASEVAC PLANS
WILL BE CONDUCTED IN ACCORDANCE WITH UNIT SOP.
Administration/Logistics
ResupplyIn accordance with SOP
Medical
In accordance with SOP
Rules of Engagement
SUCCESSION OF COMMAND
THE PATROL WILL BE LEAD BY 2LT JAMES AND THEN BY RANK
CALLSIGNS
WILL BE CONDUCTED IN ACCORDANCE WITH UNIT SOP, SEE ORBAT FOR FREQUENCIES AND CALLSIGNS.
Fire Support Plan
In accordance with SOP
Close Air Support
In accordance with SOP
Command/Signal
Communications Plan
Callsign | Primary Frequency | Superior Frequency | ACTUAL |
---|---|---|---|
OUTLAW 1 | 250mHz | 40mHz | LtCol James Platoon Leader |
ALPHA 1-1 | 251mHz | 250mHz | Pvt SoapyTarantula Fireteam Leader |
BRAVO 1-2 | 252mHz | 250mHz | 1Lt Ben (Ret.) Fireteam Leader |
In accordance with SOP
CONNECTION INSTRUCTIONS
TEAMSPEAK IP: ops.unitedtaskforce.netGAME SERVER IP (Direct Connect): ops.unitedtaskforce.net
GAME SERVER PASSWORD: issued on Discord

TIMINGS
SERVER OPENS: 1630hrs UTCFORM UP: 1700hrs UTC
ANNOUNCEMENTS/BRIEFING: 1715hrs UTC
STEP OFF: 1725hrs UTC
END-EX: 1900-2000hrs UTC APPROX
All are GMT/UTC
