
OPERATIONS ORDER
Operation Silent Dawn (2025), Shark Tank
TO:
OPERATIONS OFFICER
United Task Force
UNITAF Forces Beketov
OPERATIONS OFFICER
United Task Force
UNITAF Forces Beketov
FROM:
Lt Gen Chad P. Franks
CMDR CJTF USCENTCOM
MacDill Air Force Base Tampa, U.S.
Lt Gen Chad P. Franks
CMDR CJTF USCENTCOM
MacDill Air Force Base Tampa, U.S.
--- OPERATIONS ORDER ---
Situation
Background InformationFollowing Beketov's attack on Chernarus and JB Keith, 26 MEU will conduct an amphibious landing on Utes Isle to seize and deny the enemy access to their forward airbase and disable anti-ship batteries and SAM sites which would impede subsequent operations to secure a mainland landing.
Five-Star Rating System
Combat Intensity:☆☆☆☆Roleplay Emphasis:☆Difficulty:☆☆☆
Friendly Forces
ANGEL 1 is a USMC Amphibious Squad w/ 2x combat speedboats ANGEL 6 will operate a UCAV Sentinel and FPV Attack UAVs.
Supporting Assets
TF Keith is fully mobilized in the AO and US Army V Corps are beginning combat deployments in the region as well. The operation will be supported by LPD-36 USS Lubbock and DDG-125 USS Liberty, providing logistics, air defense and naval fire support.
Enemy Forces
CSAT forces on Utes Isle is composed of the airfield crew and garrison, and likely has been reinforced by airborne infantry and vehicles. Light and armored vehicles such as BMDs and BMPs are expected. Aerial ISR shows 2x 2K22 Tunguska AAA emplacements on the airfield. However, as this is an established military base, the possibility of heavier armor is present. Rotary-threats are possible. Fixed wing threats from the base are unlikely as a result of HIMARS strikes which are believed to have disabled the runway; however, the mainland airfield is operational and may sortie aircraft.
Mission
TaskingANGEL 1 is tasked with securing the airfield on Utes Island and disabling any anti-air and anti-surface weapons which may threaten friendly assets pushing towards the Beketovian mainland.
End-state
The desired end-state will be ANGEL 1 having secured the south of the island up to and including the airfield.
Execution
Commander's IntentAfter securing the immediate landing area, the ANGEL 1 will be assaulting enemy positions with a priority target being the weapon emplacements to allow supporting elements to follow the landing.
Tasks and Sequencing
DUE TO LACK OF TEAM LEADERSHIP SPECIAL COMMUNICATION AND CONTROL WILL BE USED, DETAILS IN COMMAND/SIGNAL SECTION During maneuvers ANGEL 1-1 will be designated Assault and ANGEL 1-2 will be designated Cover. PHASE 0 ALL CALLSIGNS will prepare equipment for the mission and board designated vehicles. ANGEL 1-2 Ammo bearer is to carry mainly MG ammunition. PHASE 1 Landing During landing approach ANGEL 6 will be tasked with recon of the primary landing area and prepare to engage targets within 400m. Upon reaching the 1km mark or on taking fire, ANGEL 6 is cleared to engage targets previously designated. UAV should remain in a pattern at least 1km West of the island until enemy AA has been suppressed or on specific request. Upon landing ANGEL will move to take position at H248 for regroup. PHASE 2 Airfield assault Sectors will be cleared in the following order: FOB BRAVO, Airfield N, FOB ALPHA, Airfield S, FOB DELTA. Most weapon emplacements are expected around the airfield, those should be rigged for demolition once the immediate area has been cleared. Detonation will be done only on command from ANGEL 1. Upon confirmed neutralization of anti-air capabilities, ANGEL 6 is clear to shift pattern over the AO directly. PHASE 3 South assault ANGEL 6 is to provide recon of remaining compounds and preparing to engage any major threats. Upon regroup and resupply with support forces, ANGEL will move through sectors in the following order: Strelka S, Strelka E, Strelka N Should other points of interests be identified in the AO, ANGEL may be called to move and investigate those positions.
Administration/Logistics
ResupplyALL CALLSIGNS will cross the LD fully loaded according to the units SOP. These supplies will come from the staging area. This basic load is expected to sustain the team up to PHASE 2. Additional supplies and equipment will be available once supporting elements have landed.
Medical
Medical support will be conducted in field (PAK in Field)
Rules of Engagement
In accordance with SOP
Fire Support Plan
In accordance with SOP
Close Air Support
ANTI-VEHICLE and ANTI-PERSONEL CAS provided by and authorised via ANGEL 1, in accordance with SOP. ANGEL 6 is cleared to engage active threats classified as AFVs or higher, and at least 300m away from any friendly forces.
Command/Signal
Communications Plan
| Callsign | Primary Frequency | Superior Frequency | ACTUAL |
|---|---|---|---|
| ANGEL 1 | 250mHz | 40mHz | Cpl TomH Squad Commander (≤15) |
| ANGEL 1-1 | 251mHz | 250mHz | PFC Murk Fireteam Leader (≤6) |
| ANGEL 1-2 | 252mHz | 250mHz | PFC AquaFox Fireteam Leader (≤6) |
Due to lack of dedicated Team Leads, a member of each team will be designated to act as Team Leader on top of their current role. To ease communication, squad frequency 250 will be used as a non-transactional net, though communications are to remain clear and brief.
CONNECTION INSTRUCTIONS
TEAMSPEAK IP: ops.unitedtaskforce.netGAME SERVER IP (Direct Connect): ops.unitedtaskforce.net
GAME SERVER PASSWORD: issued on Discord
TIMINGS
SERVER OPENS: 1830hrs UTCFORM UP: 1900hrs UTC
ANNOUNCEMENTS/BRIEFING: 1915hrs UTC
STEP OFF: 1925hrs UTC
END-EX: 2100-2200hrs UTC APPROX
All are GMT/UTC