Planning for construction - Guide - UNITAF Force Manual (FM)




Planning for construction



Current Version (3 days ago)

FM/BG-1793.V1.00 - Planning for construction

Construction projects should be planned before deployment, particularly when building large compounds or defensive positions.

Key considerations:

  • Use terrain effectively
    • Take advantage of elevated positions and existing structures
    • Ensure sufficient flat ground for construction
  • Consider surrounding terrain
    • Use natural obstacles such as rivers or steep slopes
    • Avoid locations overlooked by nearby high ground or concealed approaches
  • Maintain access
    • Consider proximity to roads and supply routes where regular access is required
    • Avoid creating predictable approaches to defensive positions
  • Partition the site
    • Separate key facilities to reduce the effects of attack or accidents
    • Use barriers and walls to limit blast effects and line of sight between sensitive areas
Last major change: Initial Version
Published by Cpl Ross on 26/06/2026 at 09:10

Previous Versions (0)

This page generated 1.05MB in 0.0652 seconds.