Pre-slotting - Guide - UNITAF Force Manual (FM)




Pre-slotting



Current Version (664 days ago)

FM/BG-246.V1.01 - Pre-slotting

Pre-slotting is a muster period that occurs after ORBAT creation and before ORBAT release. The pre-slotting stage is typically 24 hours before release. During the pre-slotting stage Leadership and Mission Support slots are opened ahead of general release - allowing members to see who the Leaders and Mission Support Team will be before slotting.

During the pre-slotting phase the assigned Field Leader and Mission Support Team also slot to ensure they are allocated before general release. No other roles are possible to be pre-slotted before general release and pre-slotting is a self served process - except as outlined in manual allocation.

Published by LtCol James on 21/01/2024 at 23:07
Compare with previous (V1.00)

Previous Versions (1)

This page generated 1.04MB in 0.0844 seconds.